SC4 Devotion Forum Archives

SimCity 4 Devotion Custom Content Showcase => Network Addon Mod (NAM) => Topic started by: vakz on March 22, 2013, 04:47:14 AM

Title: Issue building Windmill interchange
Post by: vakz on March 22, 2013, 04:47:14 AM
Hello everyone!

I'm trying to follow this (http://sc4devotion.com/forums/index.php?topic=14069.msg422936#msg422936) guide in order to build a Windmill interchange. I have gotten as far as the fourth picture, but I now need to connect the ground RHWs on either side with each other, but they won't connect.

When I try, it looks like this:
(https://www.sc4devotion.com/forums/proxy.php?request=http%3A%2F%2Fi.imgur.com%2Fqc5r4Lh.jpg%3F2&hash=daf5f7887fb657f0332ccba2e68fa53f44d3141a)

Releasing the button will cause the "intersection" piece to become an elevated piece, in the same direction as the lower RHW.
Title: Re: Issue building Windmill interchange
Post by: Tarkus on March 22, 2013, 09:19:01 AM
The L2 networks are a bit unstable right now.  That's a known issue.  You'll need to wait for further upgrades to the RUL2 file for that to work.

-Alex
Title: Re: Issue building Windmill interchange
Post by: vakz on March 22, 2013, 09:25:19 AM
Oh, okay. Is this something you're planning on doing in the near future?

UPDATE: Some small changes (putting any special elevated pieces further away from the ground rhw) fixed it, and my windmill interchange is now up and running  ;D