• Welcome to SC4 Devotion Forum Archives.

Metarvo GRVII - Challenge 10

Started by metarvo, July 07, 2010, 02:56:15 PM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

metarvo

Here is my Challenge 10 thread, Fred, although I assume you want me to get Challenge 9 done before you issue me Challenge 10.
Find my power line BAT thread here.
Check out the Noro Cooperative.  What are you waiting for?  It even has electricity.
Want more? Try here.  For even more electrical goodies, look here.
Here are some rural power lines.

mrbisonm

Highway Transportation and Regional Access


Here is Your Highway Challenge 10, Metarvo.



This is the most difficult Challenge in the series of Eleven Challenges in all (Plus the final/conclusion in 12). This challenge is to test your mayorly patience and logical sense of planning and construction. Use all your Mayor skills to make it practical, logical and beautiful looking.
 
The highway itself  is shown in RED and is allowed to change into an Avenue (Boulevard) on 3 different tiles only, so choose your locations well. You may build only 50% or so of an avenue in each tile though, the rest will have to be highway (any form of it). You are not allowed to build any avenue in the country, only within town- or city- limits. Building an Avenue is an option (maybe even a relief in some cases) and is not demanded for.

RED CIRCLES indicate where the 2 Highway Intersections demanded should be, it may differ from one Player to another whether it is three, four or more directions.

YELLOW CIRCLES indicate where we would like to see the access ramps to the highway. You may build as many access ramps as you wish, as long we see these 3 indicated ones in their locations.

Remember that the *PLAN* can be discussed and negociated and may be alternated to a certain degree. Up to you to give us your suggestions. First study your situation with the plan given and then offer us the results of capability and/or demands for alternations before starting building. It is the Governor's final decision who should be respected at the end, and of course, be executed as such. Only a certain amount of alternation though can be negciated and/or will be accepted. In general the plan should be executed as drawn as much as possible (shown) on the map above, unless you have valid good reasons to ask for needed changes or alternations.
ONLY after the Governor has given his official confirmation and the *Green* light, you may start the regional construction.

After the Governor's confirmation of construction, you may show us your progress with several posts and pictures while you're constructing through the region. Only once finished the Challenge, we will ask you for the pictures needed for the judgement, again, they will be individually demanded.

In Your case...   

...starting in tile G, the highway will meet the airport in tile H where the first on/off ramps should be. From here it will stay in tile H and create an intersection in town from where one way it will head south and exit the region and the other head north into tile E, where the other two on/off ramps will be. Right after crossing the river, there should be the second intersection close to town. from where the western part will go through tiles B and A, contouring your Natural Park. The eastern half will lead right into tile L where it ends in the town. Shouldn't be too hard, considering that you have not developped too much in the region yet.

Pictures needed of Your Challenge 10:

1.

2.

3.

4.

5.

..........(coming up after confirmation of Construction from the Governor and after the end of the regional construction).........


We wish you good luck with this last enormous Project of GRV II and hopefully enjoy while executing it. No rush, take your time. ;)
We also will be anxious to see your project advancing as you hopefully will show us with pictures as you slowly wind through the region.

Fred (Lynn will be present for the judgements later)


....Uploading the MFP 1.... (.........Finishing the MFP1)