Well i got a simple question, isnt Plugin Z supposed to increase subway monthly and building costs? I still have to pay 154 to build and 0,30 maintenance.
Thanks
Well, thats what the description in the game says, but when you drag it, it will show the actuall cost.
Hope this helps,
Vince
The building cost is unaffected, as changing that would create too many potential conflicts with other mods. However, the monthly cost has been increased from 0.30 to 1.20. I just verified this in the plug-in, and I have noticed the effects of this playing the game.
EDIT: I see what's happening here. Although the actual monthly cost has increased, the menu item still reports the original cost. I missed this as I always invoke subways via Shift+T. There's an update to Simulator Z coming out soon, and this will be fixed in it. In the mean time, the actual cost really is 1.20.
Future question about Simulator Z are best directed to the NAM Traffic Simulator Z Help (http://sc4devotion.com/forums/index.php?topic=6812.0) thread.
thanks for your help