• Welcome to SC4 Devotion Forum Archives.
 

News:

The SC4 Devotion Forums are no longer active, but remain online in an archived, read-only "museum" state.  It is not possible for regular members to post or use the private messaging system, and no technical support will be provided for any issues pertaining to the forums in their current state.  Attachments (those that still work) are accessible without login.

The LEX has been replaced with SC4Evermore (SC4E), and SC4E maintains an active Discord server.  For traditional forums, we recommend Simtropolis.

Main Menu

Trying to start off 2016 with my first RHW bridge

Started by Pythias900KMB, January 01, 2016, 01:16:42 AM

Previous topic - Next topic

0 Members and 1 Guest are viewing this topic.

Pythias900KMB

Ahoy!  I came across the Diagonal Bridge Enabler and was quite astonished that it drained (and refilled!!!) the water exactly as advertised; still, I believe that I have some more work to do before I am ready to make real use of the DBE.

Right now, I am planning to build a 4th lvl elevated RHW 6S across the bay.  There is a thread on this site that explains how to avail two On-Slope Transitions stacked at two different elevations (2nd lvl and 3rd lvl to be exact); bearing that tutelage in mind, I have placed an OST at 2nd lvl elevation and at 4th lvl elevation as indicated in the screen capture.  My previous attempts have resulted in a beautiful slope transition coming off the embankment but not actually connecting with the 4th lvl elevated RHW 6S Starters.  For this endeavor, I have also added 3rd lvl RHW 6S starters.  I believe that I have covered all my bases and I am hoping it succeeds; still, I cannot escape the feeling that I am overlooking something.

Any counsel?

Pythias900KMB

ARGH!!!  Failure again!!!  Please ... some counsel on where I am going wrong ...